4024 S. Grove Rd., Spokane, WA 99224 • (509) 838-4455 • Fax (509) 838-4464
Selective Withdrawl System construction consisted of assembling and installing the 700 ton SWB, 40' x 120' column, 1,200 ton floating fish trap and the access bridge. The SWB was set at the bottom of the 270' deep lake.
Crane rehabilitiations.
Skid/jack, move and set the new 365' x 44' wide x 1,680-ton Sauvie Island Bridge North of Portland, OR
Replaced the top 62' of Conditioning Tower and replace Raw Grinding Duct in a two-week outage.
Selective Withdrawal System—Value Engineering
Rehabilitate 100-ton Intake Gantry Crane
Erect 480-ton Intake Gantry Crane
Repair and Align Photocells at South Hangar Door
Emergency Rail Ring Repairs Followed by Rail Ring Replacement on 200-ton Clyde Revolver Crane
Repair Shipping Bin Bottoms at Silos 1,2,3 & 4