Portland Corps of Engineers

The Dalles Dam—Two Bridge Crane Rehabilitations

 

Attention: open in a new window. PDFPrint

Portland Corps of Engineers

The Dalles Dam—NAV Lock Gate Replacement

 

Attention: open in a new window. PDFPrint

Portland General Electric

Selective Withdrawl System construction consisted of assembling and installing the 700 ton SWB, 40' x 120' column, 1,200 ton floating fish trap and the access bridge. The SWB was set at the bottom of the 270' deep lake.

 

Attention: open in a new window. PDFPrint

Portland Corps of Engineers

Crane rehabilitiations.

 

Attention: open in a new window. PDFPrint

MJ Kuney/Oregon DOT

Skid/jack, move and set the new 365' x 44' wide x 1,680-ton Sauvie Island Bridge North of Portland, OR

 

Attention: open in a new window. PDFPrint

Ash Grove Cement

Replaced the top 62' of Conditioning Tower and replace Raw Grinding Duct in a two-week outage.

 

Attention: open in a new window. PDFPrint

Portland General Electric

Selective Withdrawal System—Value Engineering

 

Attention: open in a new window. PDFPrint

Portland Corps of Engineers

Rehabilitate 100-ton Intake Gantry Crane

 

Attention: open in a new window. PDFPrint

Portland Corps of Engineers

Erect 480-ton Intake Gantry Crane

 

Attention: open in a new window. PDFPrint

State of Oregon—Military Department

Repair and Align Photocells at South Hangar Door

 

Attention: open in a new window. PDFPrint

Gunderson Barge and Railcar Plant

Emergency Rail Ring Repairs Followed by Rail Ring Replacement on 200-ton Clyde Revolver Crane

 

Attention: open in a new window. PDFPrint

Columbia Grain at the Port of Portland—Terminal 5

Repair Shipping Bin Bottoms at Silos 1, 2, 3 & 4