Replacement of the mechanical, electrical and controls systems is required for four cranes under this $4,000,000 contract. Dix work begins with a pre-rehab inspection of the cranes and finishes with the testing and commissioning. Dix will work on two 350-ton powerhouse bridge cranes, one 140-ton intake gantry crane and one 30-ton tailrace gantry crane.