4024 S. Grove Rd., Spokane, WA 99224 • (509) 838-4455 • Fax (509) 838-4464
Lower Monumental Dam—NAV Lock Gate Replacement
Wanapum Dam Top Spill Bulkhead Removal
Lower Monumental Dam—Downstream NAV Lock Gate Repair
Cabinet Gorge Dam load test 250-Ton gantry crane
Container Crane Repositioning & Recommissioning Jack and move (2) Container Cranes each with the capacity of 40 Long Tons from a temporary location to the permanent location on the Pacific Terminal.
Fish Ladder Transition Pool Modifications Cavitation and Runner Repairs at Units 1, 2 & 3
Dismantle three lime kilns and two preheaters from a magnesium plant in Addy, WA.
Rehabilitate 500-ton Powerhouse Bridge Crane Supply and Install 1,000-ton Removable Spillway Weir(RSW) Repair Upstream Navigation Lock Gate
Repair Fish Attractant Water Pump No. 2 Rehabilitate 2 Powerhouse Bridge Cranes, 1 Intake Gantry Crane and 1 Tailrace Gantry Crane
Intake Gantry Crane Operator Cab Modifications 18-Ton Trailrace Crane Rehabilitation
Juvenile Fish Sampling Facility Enhancements
(2004 and 2005 Work Orders) Coker Crane Trolley Wheels and Rail Coker Clamshell Bucket Repair 17.5-ton Semi-Gantry Crane Annual Inspections Landell Crane Repairs—Drive Replacements, Brake Replacements and Emergency Cab Repairs
Equipment Disassembly, Moving and Loading
Intake crane refurbishment.
Supply and Install Underwater Antenna Tracks Replace Navigation Lock Gate Hoist Bearings and Cables
Various crane and crane rail refurbishments.
112" Mill and Pinion Stand Repair 8" Shear Cylinder Foundation Repair Crane Rail Survey at Building 2102 Salem Furnace Quench Pump Replacement Rebuild Soaking Pits No.13 and No. 14
Dismantle a 500-ton and 400-ton press
Design/supply and installation of a 519’ air supported clinker conveyor for Ash Grove Cement Company.
Grain Elevator Conveyance Modifications
Cullett Elevator Replacement and Bin Modifications
Refurbish a 150 ton gantry crane. This work included new travel/hoist controls, new operator cab and equipment room, replacement of all wiring, refurbishment of the travel/hoist gearbox, hoist motor and brakes.
Trash Rake rail installation, including civil and mechanical work.
Erect 2 Powerhouse Bridge Cranes, 1 Transfer Crane and 1 Draft Tube Gantry Crane Rehabilitation of Five Crane Runways Uncover Embedded Crane Runway Rail, Repair Expansion Joint at Draft Tube Deck, Remove Powerhouse Wall Tiles and Repair Concrete at the Adult Fishway Konecranes - Installation of (4) new cranes, a 75-ton Transfer Crane with a 15-ton Auxiliary Hoist, a 20-ton Tailrace Crane and (2)80-ton Powerhouse Bridge Cranes.